Show ARROWHEAD RIG NEAR COMPLETION A crew of men is busy at the Punch Bowl finishing the rig of the Arrowhead Arrow-head Petroleum Corporation preparatory prepara-tory to spudding in the well. From present indications all will be in readiness read-iness in about three weeks. All machinery and equipment is on the ground with the exception of the large gas engine which is in St. George and can be moved out any time. The 84-foot derrick is very substantially sub-stantially built and all machinery installed in-stalled is the best obtainable for the work. The rig is being put up with the idea of going to a depth of 7000 feet if necessary to bring in production. |