Pages | 9 of 14

Salt Lake Telegram | 1932-09-07 | Page 9 | Sunnyside Reservoir Plans to be Studied

Type issue
Date 1932-09-07
Paper Salt Lake Telegram
Language eng
City Salt Lake City
County Salt Lake
Rights No Copyright - United States (NoC-US)
Publisher Digitized by J. Willard Marriott Library, University of Utah
ARK ark:/87278/s6md0721
Reference URL https://newspapers.lib.utah.edu/ark:/87278/s6md0721

Page Metadata

Article Title Sunnyside Reservoir Plans to be Studied
Type article
Date 1932-09-07
Paper Salt Lake Telegram
Language eng
City Salt Lake City
County Salt Lake
Page 9
OCR Text Sunnyside Reservoir Plans to Be Studied Plans and specifications for ration on the new Sunnyside distributing dis dis- dis reservoir with gallons capacity are aloe expected to be submitted to the city commission Thursday it was vas reported at City Engineer Engineer En En- W. W D. D Beers' Beers office Wednes day The plans will be sent to the cham chain ber jer of ot commerce water waler advisory committee in the meantime It is the engineering and water departments departments' departments departments departments' de de- plan to complete the excavation excavation ex ex- ex before fall rains and winter snows snO arrive This will all allow ow a beter better bet bet- ter er opportunity for the basin to settie settle set- set tie tle le thus preparing it for the reinforced rein rein- forced concrete lining which will be constructed early next year ear it was reported The reservoir Is part of the 2000 water system expansion program program started last year
Reference URL https://newspapers.lib.utah.edu/ark:/87278/s6md0721/16162935