| Show house I Building open T HE Building Construction T THE 1 department will be hosting hosting hosting host host- ing open houses on June 8 4 10 pm p.m. at the project house and the almost come com com- e Child Development Lab The project house is located located located lo lo- at 1402 W. W So and the lab is located at the southeast comer corner of campus According to building instructor instructor instructor in in- George Billings construction construction construction con con- on the project house began last spring It has square feet plus a double garage Amenities include include include in in- clude four bedrooms three bathrooms a redwood deck and a large kitchen pantry Students have work worked d on the concrete framing and carpentry carpentry carpentry car car- pentry roofing dry wall fireplace facing and flooring The home was sold before construction began to Bob Wagner who will take possession possession possession posses posses- sion on June 9 Building construction students students students stu stu- stu- stu dents will complete their work York on the child development development development develop develop- ment lab before the open house However electricity students and subcontractors will complete the building during the summer The square foot structure is scheduled to open before fall quarter begins Students worked on the buildings in teams of six and twelve rotating between projects in order to gain experience in both commercial and residential construction |