Show new school building fails inspection harold beecher represent representing representing in the firm of scott a and beecher e hr architects for the new school building in monticello was as h here or e from salt lake C city ity thursday huday to inspect the work on the structure the contractor mr flaugh and the following school board members accompanied mr air bee che cheon on the tour of the building 9 mant johnson merrill stev ashton harris bishop K y S summerland Sum summers and vera foy superintendent zenos L black and r lerk clerk george palmer were also present A decision was reached by the architect and board members that the building would not be accepted as finished at the present time because of defects in the floor of ohp main corridor the cement was not properly leveled and is breaking through the tile in some places and will therefore have to be refinished this means that the students will have to return to school to the old building for two or three weeks until the necessary work can be completed the decision is disappointing in some respects but it is a fine thing to correct any mistakes and to have every 11 ing ng in perfect unter when the amoye js is made |