Show Revised Plans n Duchesne High School Underway DUCHESNE Plans for the Duchesne High School building project are being revised in order that the cost of construction will come within the funds available for the reports Rowan C. The projects Cannon and Mullen of Salt Lake have been authorized by the local board of education to proceed with final drawings and specifications in preparation for bid advertising an opening about April Construction is expected to begin soon after this The revised plans will include square feet of new the remodeling work will include a new heating plant plus minor remodeling to the Cost of the new construction was reduced some by eliminating ceramic tile in dressing rooms and asphalt tile in the corridor and science These areas will have finished concrete the superintendent The toilet stalls will be instead of the proposed marble and less expensive fixtures will be installed than those previously specified in the Revision of the plans for the construction at is an out come of a meeting of local school officials with representatives of the state building board and state board of education and the building architects held in Salt Lake City last v c |