| Show brooklawn Brook lawn creamery installs telluride power service last week the richfield line crow crew of the telluride power company installed a large substation and built over a mile of volt line and coni connected lecter the brook bronk lawn creamery beaver city corporations po rations largest consumer of power with their main line running through the northwest fields the loss of the creamery business to the municipal plant means approximately per month and was the result of failure of negotiations running over the past two months involving rates and terms of contract conti act beaver press |