Show certificate gr granted anted for or fish lake stage in compliance with an application made by the fish lake resort co for permission c emission to operate an automobile mobile passenger and express line between richfield and fish lake and all intermediate points the public utilities commission after a hearing conducted in richfield issued a certificate of convenience and necessity to operate such a route for hire over the public highway between richfield and fish lake making one round trip each day and such additional trips as the public interest may require during the summer season from june 13 to october 20 of each year consequently an order was issued that the applicant before beginning operations prat lons shall file with the commission and post in each station of the route a schedule naming rates and fares and showing arriving and leaving time from each station on the line and shall at all times operate in accordance acor dance with the laws of the state of utah and ane rules and regulations prescribed by the commission |