OCR Text |
Show I Power Plant Planned. The largest hydraulic power system In Europe is to be built in Bavaria and operated as a public utility, according to plans completed recent". The power pow-er Is to be obtained from Walchen lake in South Bavaria, and will be transmitted by cable from Koeehel to all towns and villages throughout Bavaria. Ba-varia. A commission, which has been studying the undertaking for two years, has submitted a detailed memorial me-morial to the Bavarian diet estimating the cost of the enterprise at 7S.tKl,0(X( marks. The cost of the system is to be borne proportionately by the Bavarian Ba-varian government and the municipalities municipali-ties benefiting by this great electrical plant. |