Show Renovation Plans Near Completion Richard architect architect architect archi archi- and V. V Quentin Tre- Tre gagle consulting engineer met with the Davis County C Commissioners and discussed the engineering plans for heat and air conditioning in the upstairs renovation of the courthouse MR explained that a separate unit for the changes would function more efficiently and would be about half the cost of tying in with the present unit also leaving capacity of the present system for heating and cooling other parts of the building After hearing an evaluation of both plans Mr was advised to proceed with the individual unit plan Mr also presented de de- de- de tailed drawings of the proposed renovation plan and said that the first phase of the project should be completed in 90 days after construction is started the second phase in about 65 days Plans will be completed and ready for bids in approximately ten days Haven Barlow met with the commissioners and as a property property property prop prop- erty owner in the Fairfield Road area was briefed on the design proposed by consulting engineers Nielsen Maxwell THE BOARD changed their approval of a constable for Cor the Bountiful Precinct In an error in their meeting of Jan 10 the minutes were changed to read Mrs George Carolyn Burbidge instead of Mr Burbidge Bur- Bur bidge Mrs Burbidge will serve until December 1970 when it will be necessary for applicants to file for election election elec elec- tion |