OCR Text |
Show Utah-Deleware Increase Output trwing to the large bodies of ore of smelting grade developed in the properties of the Utah-Deleware, this large dividend paying mine finds itself in a position to take advantage of the stable condition of increased output almost al-most 80 and is now around 900 tons as against a former average of 500 tons. This tonnage is being be-ing handled over the arial tramway tram-way which connects the mine with the International Smelter in Tooele valley, in a very satisfactory satisfac-tory and efficient manner. |