OCR Text |
Show SARDINE CANYON i PROJECT APPROVED Plans for the Sardine canyon road betwei a Welle,sille and the box Elder ;County line lias been approved by the 0 bureau of public roads accord-1 n u li. .1. Finch, district engineer This road Which is G.G miles long will cost approximately $i-o.ooo. it will be of gravel surface. Plans for the Magna-Tooele COUnfy-road COUnfy-road In Salt Lake county have also been approved by the bureau This road will be i; miles long and Will be paved. It will cost about $250,000.; 1 Other pVOjects In various parts of the state trill be approved during thoj Week, It is stated. I he Improvement work on the on r- head crossing of the Bamberger electric elec-tric lines at Farmlngton has started. the official sanction of the state being be-ing given today. A detour will be necessary for sev- eral days until this strip of pavement 1 completed. It is announced. It is not known whether the detour will be, made over the old crossing or near ithe Bamberger depot a. BTarmlngton. I If the old crossing Is usod watchmen win i.e etnploycd to safeguard the- pub- I lie. Dlstrli t Engineer Finch said today. to-day. With this strip of road paved the only remaining stretch unpaved between Ogden and Salt Lake will be; the Rlverdale crossing. |