OCR Text |
Show EXTENSION OF ELEVATOR SERVICE Workmen employed by tho Otis Elevator El-evator company began work this ' morning at the postofflco. arranging I for the extension of the elevator shaft to the basement , The concrete in connection with the extending of the slnft v ill be done ' by Harrj Bateman The order allowing for Buch extension exten-sion and the knowledge that the contract con-tract had been let was received bj I the postmaster several days ago. fol-lowinK fol-lowinK a recommendation to ihe l' -partment at Washington that such an extension s necessary Much material for the use of the I offices on the upper floors stored in the basement and can be more conveniently con-veniently handled by having tho ele-vator ele-vator extend to thn Fton1 rooms The contractors expect to have the work finished within a period of 30 days. no |