| Show s P TUNNEL WORK AWARDED Utah Construction To Dig Three Bores In Sierras ct for or the dl digging of ot three tunnels on the Southern Pacific line linc In the Sierra Nevada moun moun- mountains has hns been bean awarded the Utah I Construction company and the tho company Is now mi m equipment establishing camps at the points of ot the tha work according to toW Vt II If Wattis s One tunnel Is to tobe be cast east of ot the summit of the Mountains and the tha two othen west Tho work Ii 1 I to cost betwee between and Considerable second tracking we will also be laid at nt the time ot of the digging of ot the tunnels and wIth ha completion t there re wilt will be a con- con is double track on the South Southern ern em t pacific lines from Sacrament to parks Nev The contractors s are given until net neit June to complete complot the tho work |