OCR Text |
Show iFirmage Theatre ! Remodeling Starts i With the preliminaries already underway and that part of the building above the ceiling and the rear portions of the building changed materiallly while still open for business, the greater part of the remodeling of the local Fir-, Fir-, mage theatre will not get going until Monday, when the show-house show-house will be closed for six days, to re-open Sunday, July 4, almost completely transformed from its present appearance. The small office rooms heretofore hereto-fore located in either side of the lobby will be eliminated and that space utilized for restrooms and ladies lounge on one side while Mr. Firmage will have his office and poster room on the other. The ticket booth will be brought out to the sidewalk line and the foyer partition will be brought back to permit the addition of three rows of 16 seats each in the rear of the present seating arrangement. This also will be changed with the aisles moved closer to the sidewalls, two seats on each side being added to i the center section. Also, the floor incline will be in-! in-! creased to more than double its j present gradient and complete air-i air-i conditioning equipment will he added, to make the local theatre one of the finest in southern Utah. |