OCR Text |
Show St. George To Have New L. D. S. Chapel Work on the South Ward chapel which was started a week ago, is progressing under the direction of the contractor, C, A. Kemp. Exca a-tion a-tion has been completed, and rock for the foundation is now being hauled from the black hill west of town. It is planned to have the building buil-ding ready for occupancy by September Sep-tember 1st, according to Mr. Kemp. The new chapel and social liali will be an imposing structure. It is located a block south of the Dixie college on a lot !I0 feet fronting on Main street by S rods deep. Pope .'i Burton of Salt Lake City are the architects. ar-chitects. Washington Co. News. |