| Show TO RESUME GRADING ROAD FOR SMELTER Work Worl ot of grading the tho International line of railroad Smelting company's compans Ino site from rom Tooele City to the smelter In Pine canyon for some somo I some time on account or of thA heavy henvy snow fomo and weather is to be beI I resumed Monday Tho grade has been constructed for three miles mies out been laid n nf and tracks have at the tho the tho company's yards ards 11 u. u Tho total length h of th the line Ino will m Ut he hC nine nino miles mies The grading to be bedone bedone done Is not heavy henvy and with favorable ta athor the line lne will wi bo be In operation within GO 60 days Then the tho heavy hean work worl building the smelter will be or of wl a aare Grading at the tho sito and lay lay- tag Ing of foundations are already alread In pro- pro |