Show Students Will Build New Tennis Court The Annual A day will be held at atthe atthe atthe the Branch Agricultural College Friday April 3 The work will be in charge of Cecil Baker student body president and D L L. Sargent faculty tive The main project for the day will bethe be bethe bethe the building of ot a new tennis court on the campus The court will be built by bythe bythe bythe the College class who have contributed I money to buy the material and who will contribute labor to construct it I Other projects of the day include the raking and cleaning of the lawns the cleaning of the athletic stadium the re graveling of the walks alks and driveways The work will begin at A. A M M. At the girls of the institution Uon tion will serve a luncheon after which a two hour recreational program including Including including In in- a matinee dance and an Indoor baseball game will be held I |