OCR Text |
Show hereby notifies all bidders that it will affirmatively insure that the contract entered into pursuant pur-suant to this advertisement will be awarded to the lowest responsible re-sponsible bidder without discrimination dis-crimination on the ground of race, color, or national origin. Proposal forms, plans, cross sections and specifications are on file in the office of the State Road Commission, Salt Lake City, and the office of its District Engineer at Cedar City, Utah, where they may be reviewed by prospective bidders. bid-ders. Specifications, proposal forms, and plans may be obtained ob-tained at the Commission Offices Of-fices at Salt Lake City, upon application and payment of a fee of $5.00, no part of which will be refunded. Each bidder must' submit a letter from an approved surety company guaranteeing guar-anteeing to furnish said bidder with required bond. The right to reject any or all bids is reserved. re-served. Cach, certified check, cashier's cash-ier's check, or approved proposal pro-posal guarantee bond for not less than five per cent of total amount of bid made payable to the State Road Commission must accompany each bid as evidence of good faith and a guarantee that if awarded the contract, the bidder will execute exe-cute the contract and furnish contract bond as required. Any additional information may be secured at the office of the State Road Commission. Dated this 2nd day of April, 1966. STATE ROAD COMMISSION OF UTAH Henry C. Helland, Director of Hhigways Pub. April 7, 1966 NOTICE TO CONTRACTORS Sealed proposals will be received re-ceived by the State Road Commission Com-mission of Utah, Room 608, State Office Building, Salt Lake City, Utah, until 2 o'clock p. m. Tuesday, April 26, 1966, and at that time publicly opened open-ed for construction of Spring Development in Beaver County, the same being situated 3-plus miles East of the Pine Creek Hill 1-15 Interchange identified identi-fied as Federal Aid Project 1-15-3(12)130 2nd Contract. The principal items of work are approximately as follows: 400 Lin. Ft. of Right of Way Fence Type "E" and 147 Lin. Ft. of Galvanized Steel Pipe with Fittings. The project is to be completed in 20 working days. Prequaliflcation of bidders is required. Prior to any bidder's receiving plans and specifications; specifica-tions; it will be necessary that the bidder have on file with the State Road Commission of Utah completed and approved, the required Prequalification Statement pertaining to contractor's con-tractor's experience and financial finan-cial condition. The attention of bidders is directed to the Special Provisions Provi-sions covering subletting or assigning as-signing the contract. In conformity con-formity with Section 115 of the Federal Aid Highway Act of 1956 the U. S. Department of Labor has certified the wage rates for this project which are , the minimum wages to be paid on this project. These rates are made a part of the contract documents. The attention of bidders is directed to the fact that this Commission has been advised by the Wage and Hour Division, Divi-sion, U. S. Department of Labor, La-bor, that contractors engaged in highway construction work are required to meet the provisions of the Fair Labor Standards Act of 1938, (52 Stat. 1060). The State Highway Department, Depart-ment, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252) and the Regulations of the Department of Commerce Com-merce (15 C.F.R., Par 8), issued is-sued pursuant to such Act, |