OCR Text |
Show STORM DELAYS FISH PLANTING Two tankloads of fish consigned con-signed by the state hatchery to the Enterprise reservoir, were placed in tanks at Beaver when it became apparent that the machines ma-chines would not be able to reach the reservoir on account of the storm Tuesday. XVhen the weather clears two more tank loads will be brought down together with those left at Beaver, which will majke a total to-tal of six tank loads received in Washington county so far this iyear. Each tank contains six to eight thousand fish. It is expected that in addition to these six loads, two or three more j shipments will be sent in. |