OCR Text |
Show ROAD OILING CONTRACT LET Contract for oiling 3 6.6 miles of high-way in Washington, Kane and Iron counties, was awarded to Northwestern Engineering company of Rapid City, South Dakota, by the state road commission com-mission Monday. Total cost of the projects,, in-chiding in-chiding oil and materials will I be $S9.043. with a labor cost of. S37.64S. The highway improve-1 ment job between St. George and the Indian reservation is in-' eluded in the contract, and oil i will be applied Immediately on! the completion of the grading j and surfacing. i |