Show Concrete Lining Job Completed on Water Hollow Tunnel Installation of 41 miles of concrete lining in the Water Hollow Tunnel east of Strawberry Reservoir has been completed completed com Lynn S. S Ludlow general manager manager man man- ager of the Central Utah Water Conservancy Conservancy Con Con- District said Tuesday MORE THAN cubic yards of concrete were used in the pie construction of the 14 inch 14 inch thick lining he said Water Hollow Tunnel is the first section sec sec- section tion of Strawberry Aqueduct to be com com- The 37 long mile mile long aqueduct will divert water from streams on the south southside southside southside side of the Uinta Mountains to the enlarged en barged Strawberry Reservoir Water stored stor star ed cd in the reservoir will be used along the Wasatch Front as part of the Central Utah Project CONTRACTORS UNDER the direction direction tion of the U. U S. S Bureau of Reclamation Reclamation have poured concrete continuously continuous ly by in the tunnel lining since October Even extreme below below zero zero weather did not stop the work Mr l Ludlow said An oil furnace was designed and built by the contractor to keep the tunnel warm MR LUDLOW noted that U. U S. S 40 is being relocated above Strawberry Re The new highway will pass over overa a reinforced concrete pipe adjoining the concrete lining of the tunnel The highway relocation is planned to tobe tobe tobe be completed this year Some people carve careers others chisel S J lid Epitaph for a dog Ills His tail tall still wags in my heart I |