Show ADVERTISEMENT FOR BIDS Separate sealed Bids for the construction of Phase 2 and Phase 3 of the Schedule 7B Sewerline Project will be received by the Ashley Valley Water and Sewer Improvement District at the office of said District, 85 South 200 east, Vernal, Utah, until 4:p.m. (MDT), June 16, 1983, and publicly opened and read aloud. Phase 1 of the Schedule 7B Sewerline Project was an emergency section sec-tion of line, the installation installa-tion of which was negotiated in order to avoid emergency conditions. condi-tions. No bids will be accepted ac-cepted for Phase 1 of the Schedule 7B Sewerline Project. Phase 2 of the Schedule 7B Sewerline Project will consist of the installation only of 5,600 feet of 18" sewerline, 2,890 feet of 12" sewerline, with related manholes, surface sur-face restoration, service laterals within roadways, road-ways, and other miscellaneous work. Pipe and manholes, including in-cluding frames and covers, will be supplied by the owner. Phase 3 of the Schedule 7B Sewerline project will consist of the construction construc-tion of an elevated wash crossing, the installation only of approximately 540 feet of pressure and gravity sewerline, the furnishing and installing of a cased state highway crossing, and a pump sa-tion sa-tion with related site work, concrete work and accessories. The Owner will furnish the water control gates, pumps and controls, and all sewer-pipe sewer-pipe outside the limits of ' the pump station. The contract documents, consisting of . Advertisement for Bids, Information for Bidders, "Bid, Bid Bond, Agree-"rrrent, Agree-"rrrent, Payment -Bond, .Performance Bond, Drawings, Specifications and Addenda, may be examined ex-amined at the following locations: Uintah Engineering: 85 South 200 East, Vernal, Ver-nal, Utah Ashley Valley Water & Sewer Improvement District: 85 South 200 East, Vernal, Utah Associated General Contractors of America : Salt Lake City, Utah Intermountain Contractor, Con-tractor, Inc.: Salt Lake City, Utah Copies of the .contract documents may be obtained ob-tained at the office of Uintah Engineering, located at 85 South 200 East, Vernal, Utah, upon payment of $50.00 for each set, no part of which will be refunded. Brownie Tomlinson, Chairman May 23, 1983. Published in.the Vernal Express May 27, June 1, 3, 8, 10 and 15, 1983. |