| Show SILVER PEAK FEAK J Out lion Mine TIM Thomas J was Interviewed li 11 i Tonopah a few days day ago ate and gae out torn tome authentic about Aboul he the pro of t work at ta Ute the Silver Peak Pak Pill It mine at II SU PeaL Peak Neva Nevada P Phim da 11 which him may not be n 11 local Intern interest The TIt main tunnel which we e are running along what hat hAf appears al to 10 be to toone e one of oC our biff Mt ledges It Is In HO feet This lids is II a I continuation of ot the old tunnel run In by the allda boys bu Our work vork out these lIMn Is an ex n Cf example of at the lurk luck In min mining lIlt Inc When our company took look over the property the tunnel was U Into the Urt kill hilt III M IS feet feL They had aad been tn la is n a desultory fashion ta blon for forea or oreate years ea on th tie UM property pro We took up the work ork la In the aid tunnel and on nit drifting I fix Ix feet fHt we e the ore body bOO We Ve Weare VeSte are Ste now flow no K lif feet in solid soUd ore ere as al the i I H Ii following the t e vein rin Every foot i of f this ore shows ho good n d milling values Wn re ne we e AreA Ant struck INck ore are six Ix feet from Crem th tM at of the Ule ie the niP tt Is Iii six feet fHt In is width and at lit the end of the thein in tI feet of working the en In li It eight feet wide with Indications rotating pointing r to 10 a greater width as a the tunnel is driven I farther r along On last lut Monday Mend lIve five assays were r C made from M toO O round taken n I from tram the tho entire length bf hI the ore body In the Ih main tunnel The lowest loesl assay iI showed n In iii gold and the highest four I ounces I At et present re nt cross culs cuts are art being run I from various parts pari of the main tunnel to ascertain the length of ot the vein A conservative estimate made mati on actual measurements of or the ore bod tapped by bythe bythe the Ihl main tunnel places place the ore or In I hl at lit tons totis I The company ts is I also alo running a sec eec rod nd tunnel about a Hundred bundred yards ards be 00 below betow I tow low he the main tunnel The smaller tun tune tunnel nel 1111 ci I It is In 10 II feet teet and 1111 1 another ledge 1 g 10 I I and a half halt foot feat f In width has been bt ln en ea eaI red from Crom this ledge ledU ran I from rom rota H n 1 tu to IS n nI 3 Th The h laying of at the six Ix miles mile of ot pip pipe I line from Crout rein the Rod Rid Mountain spring na ba baD nab b been en D completed and there Is II plenty plent of or water at the tho mine for the tha operation of or ofa a it mill It may mar be of 0 o know that the tho pipe Use line cost COlt tiLl tho company tOm ny HAW ad n the tho work wu WM ear t I tied on by tho the company The Th bid made d for or the work by a regular Him firs was Sli At the a corn com pr hat has ha been blen erected and Ind the th five Ie stamp tump mill Is Ia s being assembled In Don Dan Donver vet ver now and will be he shipped chipped a as 11 soon lOOn ak ab possible M at Supt Knight Is tl In Denver Denser Dt taking charRe of ot the shipment Bunk Blink Bunkhouse house hll baa an n elites building ay and transformer house houle have all an been beon erected on the company property and quit a little settlement I Is II springing up there The Th activity it at the Sli SU Sliver ver vel Park Jark property I Is II very err ble Two have been Installed on ott the tb old property properlY and the pipe lino from the old ok town lon to the new town of ot is II complete The branch rose Is 18 six mlle miles oat from the siding aiding and It Is expected that the road will be he corn by b Oct 1 I |