Show CAMP CAl FINISHED AT MOON 1 LAKE LAIE Much of the preliminary work v is now finished at atthe the Moon Lake and actual work worle on construction construction construction con con- is beginning The tunnel which will carry the water away from the reservoir and the spillway spillway spillway spill spill- way are arc the first points to re receive receive receive re- re attention and work is under under under un un- der way on these The construction of the camp is completed on a site cleared for forthe forthe the purpose close to the creel creek bed below the dam Frame mess hall office and other buildings with tents boarded on the sides for bunk houses form the construction construction construe tion camp About GO 60 men are at work on the job with the num number er gradually gradual gradual- ly increasing as the project ex ex- The reclamation service is beginning beginning beginning be be- ginning construction of a office and warehouse at the dam- dam si site tee Almost daily snows and rains are falling faIling at the lake but the temperature is warm most of the time and the country is beginning beginning beginning begin begin- ning to take on its summer beauty The road from Duchesne to the lake has undergone considerable improvement at the hands of the contractors so that it is now easy to make the trip in an hour and anda i ia a quarter I |