Show BINGHAM MINES Of BINGHAM CONS CON The Past Year Has Been One of Great Activity at These Those Big Properties c GREAT MASCOTTE TUNNEL His UIS Cut Three Great Grat Ledges Which Locations Cover Coin Ore 1 The past year at nt the th mines of the BIngham Consolidated d Mining com company pany hat has ha been an active one and tho the new 1006 will 11 dawn under bright skies I IJU At JU the Dalton Go Lark mines mine which I consist of ot O the Daton I lark ark MInera Iners Dream Antelope Yosemite No 1 and mines com corn comprising comprising In tn u alt about acres the cam campaign t has hns been becu particularly vigorous properties cover three distinct veins en along aIon tho the strike for Cor a n distance of DC approximately feet During tho the year CIU 1 0 the tho Mascotto tunnel has cut till nil of ot these veins Tho rh Lark vein has lias over 1000 feet eel of o devel dovel development I work on this level TOO joo oo feet eel westerly front from tho the Intersection of ot tho the I tunnel and the vein eln and fret feet east cast easterly erly These Thes drives cast elst end and west vest we t arc aro In Inore inore I ore their entire length len th A large lorg ton lon tonnage nage of ot lead has hat been opened on the tiu east side while white to tho the west the tho valued I run largely large In copper From rom roin a 1 point on this level lovet connection was made on tho the Lark vein with ith the tho upper workings of ot the mine by b a n verti ertl vertical cal coll raise to the 1250 foot level to the level leye by an Inclined with a IL gravity skip All ores now no mined from froni rom tho tim upper lev levels 10 els es are arc dropped to the 1070 and nn 1100 foot toot levels and from there loaded Into s a I skip and dropped Into a chute on the Mascotte tunnel level from which point all the ores aro arc transported to the railroad oro ore bins through the tho Mascotto Mascotte tunnel a distance of ot feet u It live lIe ton motor being utilized for tor or orthis this purpose making nakIn a round trip from the tho loading station In tho the mines every cIery JO so minutes All ores mined arc aro moved to tho the surface In tills this manner mannel Connection la Ig l also mado wade from tOm the tho dascotte 1 tunnel levels by a continua continuation tion t on of at the Inclined vInze and gravity STaly skip down to n a 1 large lead lent slope which has hIlS been developed deelo on the tunnel level to the east of tho the Intersection of ot the Mascotte I tunnel thus affording two to In Independent Independent dependent thoroughfares for or dropping the ore Into the tunnel ore oro bins No Noh hoisting heisting br tit pumping hns has been heen done dono on this property for Cor or tome ome tIme past pat but a IL shaft Is maintained which connects with all of ot the workings anti ant antIs Is kept In commission for tor or the tho ot of lowering timber toos toes etc HAVE PRODUCED HEAVILY These combined properties have been producing from to tons of ot copper ore oro dailY dally for tor the past pant year ar the tho product being shipped to the tho smelter located on the Rio Hlo Grande Grando Western railway at West Jordan Utah via viII a 11 brunch branch line from Revere nel re station eta lion on that branch to BIngham From 50 to tons term of ot lead leall ore Is IB also produced dailY dally which Is shipped to the 0 smelter of the tiie American Smelting company at ut Murray Iuna Utah The rhe Dalton Lark properties ars Ir ar thoroughly equipped with approved mi mH n aol and appliances for tor the tho economical cal mining and transportation of ot tho product of ot tho the vast ore OIe re ye reserves serves rim Tho Ih company generates Its Hs own steam and electric power ORE DOUBLED Tho The Commercial mine another of the Mm Con Cons properties Is situated In the portIon pOllIon of the thi I camp and lius hus ha been producing copper ore ure at the rate rute of ot tons tone per day for tor the tho entire year the tho product b being shipped via tile thu Copper C Belt rail rull railroad railroad road 1011 1 from tho the mine to station thence via Ia tho the Hlo Itie Grande Western railway to the smelter at West Jordan Utah During the season Important develop developments developments ments have hao been made on the tho lower tunnel and un two new ore bodies hodIe have havo been l en opened up In virgin ground which have practically doubled tho the ore reserves of ot this thin property The Tho method pursued In mining the ore ON ONIs Is known as the North of ot England or caving caNIng system of mining which affords a very cry low mining cost rue Tho lower tun tunnel tunnel nel net connects connect II with the tho loading station of the tho Copper Belt Delt railroad the upper tunnel being connected with tho the lower tunnel by means of a n gravity op operated operated operated with skips running In balance balanco The mine milia has hus Its own power plant and generates Its own steam and air power TINTIC ORE ORB SHIPMENTS Nearly Two Curs Cars Loaded And nd ml Sent to Smelters During Durin the week closing yesterday esterday 21 shippers forwarded to tile the valley smelters ra from tho the mines of ot a total of ot carloads of ot ore are as ns follows Ajax Ajac 4 lIlack Jack Jilek 3 9 8 Brooklyn Consolidated Con 3 Heck fleck run fun Tunnel funnel runnel nel 2 Centennial Eureka 43 Carisa 2 Dragon Iron 29 Eureka 1 Hill leasers 0 I Eagle Kagle and Blue muc Hell Hull 8 a Grand arnd Central 12 Gemini 30 ao KInnear Co eo 1 I Main hun Mammoth moth rooth 13 May Day 3 RIdge Valley 4 Swansea 7 Uncle Sam G r Victoria 2 Victor Consolidated 1 Yankee eQ eo Con 5 CONDITIONS AT CENTURY What Annual Report of lit Company Just Issued Shareholders of the tho Century Cold Mining Milling company compan operating In the tho Park Parle Valley mining district arc are arcIn arcIn In receipt of ot the annual report covering the past year rear The financial statement shown that on ono Nov No o 30 there was an nn Indebtedness against the tho th company com pan at McCornick bank of against which was cash on hand of ot and guld bullion to tho the value of ot leaN leav leaving lea ing lag a net nt Indebtedness of ot An n average of per er month has been used UP d in Ill doing development work tanager Manager I 1 P W who Will Is sl slIng gIvIng Ing his time to the company without compensation turned returned re from rom tho the mine mille on the Oth In his report says 1 H HI I havo Just returned from Crom the mine and can that In my lilY opinion It looks very fair tall Wo o have havo mode made an III of oC 14 feet te l and there Is considerable tonnage of ore above sortie minis which has not be been n sloped because tIle the theold old oki workings caved we had to make an nn upraise underneath and which we weare nr are now up to In the up imp raise wo we a vein cIa IS S Inches to two twe feet teet wide rIde which assays s from rom 10 W down dawn to 15 35 5 amId we expect considerable ore from It We Vo also niso struck a vein eln In n the west drift running In the main tunnel which lies has averaged very er i set at We Wo hove have hail had no assay less ess than 5 so far tar and I think the time Property will be In good shape In the time spring to have hae another successful run |