| Show R Repairs pairs Auth Authorized I at t Mountain Dell i communication I Acting upon a n. from the superintendent superintendent ot of waterworks waterworks water water- works and another from the city engineer the the cl city ty commission Wednesday authorized the engineer I to proceed immediately to make malt such repairs as are necessary to I the cement surfacing of the upstream upstream up- up up 1 stream side of the Mountain Dell Dell' DellI tx fr dam so that the reser- reser I j voir may be filled tilled to its present capacity not later than April 25 in preparation for summer stor stor- 25 age The superintendent of waterworks waterworks water water- works says tho water supply water water-j situation sit alt is not as good now as it appeared to be earlier carlier in the year due to unu unusually early eary and heavy I runoff and it is necessary to make use of ot all available storage ca capacity capacity ca- ca I at as early parly date as possible I |