OCR Text |
Show of eommlestonera of th two counties, coun-ties, tha state road commission: K. C. Wright, resident engineer at. Wll-lard; Wll-lard; Mayor Nepal Palmer ef Farm-Inglon; Farm-Inglon; H. C. Meaaa, state road engineer, en-gineer, and J. M. Stewart, maintenance mainte-nance engineer of the ata road commtaolon. and tbe governor. Conditions were gone aver and tha final determination waa to make th loan aa stated to tbe counties and then appeal to th legislature leg-islature to reimburse th omm lesion. le-sion. . , Th flood relief fund being raised throughout th state ts atlll about tl.Oo sbr today of tha 17,0 mark set by governor Mabey In a proclamation calling upon th people peo-ple of Utah to render financial aid to th stricken reatuenta of W LI lard and Farmlngton. A letter to all oommltte chairman of relief om-mlttea om-mlttea In the various counties call ing for a eomplete report by Monday Mon-day next baa been sent out by governor gov-ernor Mabey. A large number of contribution, large and email, were reported to th committee yesterday and Mils afternoon. Th American legion turned In l7.e yeeterday. Other substantial eontrlbutlona were reported re-ported by the following: Oqutrrh make Relief society, (400; American Ameri-can Pork. Mill- Phil Purcell. head of a committee to solicit corporation cor-poration and public utllltlea expert ex-pert to report many large contribution contri-bution When hi work la completed. IMP FLOOD AREA MAKE DEFICIT Legislature Will Be Asked for Appropriations to Corer Road Funds j When th next legislature convenes con-venes It will be aaktd to mak appropriation appro-priation t cover a 'temporary loan made by th state road commission to th counties of Boxeldor and Davis for th purpose of rehabilitating rehabili-tating th highway which war Fr-tlaUljr Sarmt.i-oy gjr th recent flxV Th loan ome from th revolving re-volving fund of tb etate road commission, com-mission, which fund I for th purpose pur-pose of aiding th construction of federal aid road projects until tbe amount la sufficient to voucher th government. , The cost of reconstructing th damaged highway Is estimated at I3..000 to $40,000 and of this sum the state road commission will lend the counties half, the remainder to b furnished by tha counties. This action waa determined upon at a conference held In the office of th governor on Thursday afternoon, which was attended by th board |