OCR Text |
Show WORK AT TALISMAN. Now that the new hoisting apparatus, engine-house, ore-bins and other surface and Interior Improvements are completed on Talisman, development work will be pushed to the utmost, and excellent results re-sults are anticipated by the management. In crosscut No. 1 an ore chute running In other parts of the mine waa found and development showed over 250 feet of moping. In an old working of the property, proper-ty, recently Investigated by P. J. Dono-hue, Dono-hue, conaultlng. engineer, on the eighty-foot eighty-foot leivel a six-Inch etreak of high-grade ore waa found, which will be worked immediately. im-mediately. Ore la now awaiting shipment at the mine, and in a few days the first consignment con-signment will strive at the local smelters. |