| Show Scheme Agreed UI Upon In Chicago ChIcago Dee Dec permanent arbi board to settle all differences be between between tween labor lobor unions end contractors and the averting ot of the chances chance of labor lobor war wat practically were assured toda today At the tho meetings ot of the building tra trades es councIl and th the contractors council the report ot of the joint conference corn com representing the thc two organizations was vas accepted accept The principal recommendation of the conference committee vas the establishment tab of n a permanent board This board will consist ot of en members and adJudicate nil all dun diM that maY arise for or the formation of this board as 08 r ed cd by b this committee show n a few tew hanges from the original scheme ECheme presented pre by Martin U B Madden and ac on last Tuesday 3 JI time the commit committee teeThe tel tee The principal chancre chance was the that all difficulties must bo be Fettled within one OM da day This was as made madeU U at the request ot of the building trades In order that hat con might not be given ghen an unity to complete jobs job while the trou trouble ble le lint had arl arisen n during their erection was yas being settled hy by the oard Another mode made at the or of the men tras the of a clause that the man not he be a judge The acceptance ot of tho plan settles the tho ot of sympathetic strikes strike ns as It nU ill troubles are arbitrated there then will he be heno no 10 necessity lt for any kind or of a strike as a last resort |