OCR Text |
Show REPORT ON WATER PROSPECTS SLATED A report on possible developments develop-ments of tha upper Colorado river basin will be heard at a meeting of the Utah state water storage commission com-mission in the capitol January 4, it was announced Wednesday. The report which will be heard at 1:30 p. m. In the governor's board room from Porter J. Preston, engineer en-gineer for the United States reclamation recla-mation bureau, has been long waited wait-ed by the upper basin states, according accord-ing to T. H. Humpherys, state engineer. en-gineer. Another report will be heard by the committee on the proposed Gooseberrjtf project from the upper Price river to Sanpete valley andj final determination of permanent repairs to the much fought over Scnfield dam near. Price will be made during tha meeting, Mr. Humpherys said. |