Show WINDUP OF INSPECTION Superintendent J. J M. M I. I Davis ls Chief Engineer Engineer En En- Ashton Ashton- four our division superintendents superintend ants and four tour division engineers of ot tho the Oregon Short Line Lino left lett this city this morning for tho the final part of ot tho the general Inspection cUon which has been boon going on for to the last two weeks The Tho last if t tho the Inspection will consist of ot the Salt Lake Lako division dl of ot tho the Southern Pacific from roan Ogden to Sparks Nay Nev e with tho the branch lines The Tho inspection party expects to ho bo through with tho the Salt Lake Lako division by next Wednesday |