Show BIDS ASKED ON NEW ROAD FOR DAVIS COUNTY Highway to Be Built West of Present One as Safeguard Safeguard Safeguard Safe Safe- guard in Floods Hoping to insure continuity of traffic traffic traffic fic between Salt Lake and Ogden during during dur dur- ing lag the Davis county flood nood season the state road commission Frida Friday advertised advertised advertised adver adver- for bids on five and one hall miles gravel surfaced road to be built buill west of the present highway between Bountiful and Farmington Bids will willbe be opened July 6 C. C The construction of the road and the moving of nearly a mile half of the Bamberger Electric Elec Railroad company's company's company's com com- pany's double track will cost approximately approximately approximately according to H. H S. S Kerr chief engineer for the highway comm commission The commission also 1150 called for bids on a gravel surfaced road miles long ong between Grantsville and Timpie This rond road which will cost approximately approximately approximately will be the last link linkof linkof linkof of U. U S. S highway 40 and 50 between eastern Tooele county and the Neada Nevada Nevada Ne Ne- vada ada state line Bids will be opened July 11 |