Show AIRPORT ROAD ROADWORK ROADWORK ROADWORK WORK SLATED TO BEGIN SOON Construction Expected to Be Under Way by March 1 Weather Permitting Work on the construction of ot the airport highway will begin before Mar March h 1 weather permitting state highway officials said Friday Dodge Brothers of Fallon Fallen Nev are the low bidders on the highway work and Christensen Gardner of Salt Lake are low bidders on the bridge construction ton con on- on The contracts have not yet been let but the award will vilil be made within a aday aday aday day or two Contractors have 10 days in which to get ready for or the job Dodge Brothers have agreed to use local labor and will wUl bring in only a skeleton organization according to the state highway officials Christensen Christen Christen- sen Gardner will use local men entirely The total cost of the work will be compared with approximately approximately estimated by the highway high way engineers The materials will cost about leaving more than to be spent in construction Labor accounts will absorb a large part of this The The Dodge Dodge Brothers bid for tor the construction construction con con- of 95 miles of roadway was This includes the cost of materials The Christensen Gardner Gard Gard- ner ncr bid on five bridges was Strange McGuire of Salt Lake were next low on the highway work with witha a bid of or W. W W. W Clyde Co of Springville associated with J. J W. W Whiting ol of Springville were second low bidders on the bridges with A total of ot 28 firms bid on the two projects |