OCR Text |
Show tribution system and used for ln- dustrial anc miscellaneous purposes pur-poses in connection with the manufacture manu-facture of steel at the Geneva Steel Plant located within Sees. 5, 6, 7, 8 and 17, T6S, R2E. Any uncon-sumed uncon-sumed water will be returned to Utah Lake at a point S. 69 deg. 41' W 2665 ft. from W Cor. Sec. 5, T6S, R2E. a-1725 It is proposed to change the point of diversion, place and nature of use of .134 sec. ft of water from Apr. 1 to Oct. 31, from a 3-in. well, located at a point N. 995 ft. and E. 1210 ft. from SW Cor. Sec. 8, T6S, R2E. The water right was acquired by Underground-water Claim No. 2879 and was used to irrigate 5 acres of land embraced within SWSW Sec. 8, T6S, R2E. Hereafter, an equal withdrawal of water, or .078 sec. ft. from Jan. 1 to Dec. 31, will be diverted from a 4-in. well, 145 ft. deep, located at a point N. 1783 ft. and W. 894 ft. from SV Cor. Sec. 8, T6S, R2E, and designated as Well No. 6. The water so diverted will be commingled with water diverted under Applications Nos. a-1722, a-1723, a-1724 and a-1726 in a 10-in. 10-in. collecting main 325 ft. long, from whence the commingled water wat-er will be conveyed through a concrete con-crete water tunnel a distance of 2105 ft. to a power house where it will be pumped through a pipe distribution system and used for industrial and miscellaneous purposes pur-poses in connectioin with the manufacture man-ufacture of steel at the Geneva Steel Plant located within Sees. 5, 6, 7, 8 and 17 T6S, R2E. Any un-consumed un-consumed water will be returned to Utah Lake at a point S. 69 deg. 41" W 2665 ft. from W4 Cor. Sec. 5, T6S, R2E. a-1726 It is proposed to change the point of diversion, place and nature of use of .223 sec. ft. of water from Apr. 1 to Oct. 31, from a 5-in. well located at a point N. 2050 ft. and K. 1208 ft. from SW Cor. Sec. 8, T6S, R2E. The water right was acquired by Underground-water Claim N. 2880, and was used to irrigate 27.5 acres of land embraced within NW-SWM, NW-SWM, Sec. 8, T6S, R2E. Hereafter, an equal withdrawal of water, or .134 sec. ft. from Jan. 1 to Dec. 31, will be diverted from a 4-in. well, 145 ft. deep, located at a point N. 1783 ft. and West 894 ft. from S V4 Cor. Sec. 8, T6S, R2E, and designated as Well No. 6. The water so diverted will be commingled with water diverted divert-ed under Applications Nos. a-1722, a-1723, a-1724, and a-1725 in a 10-in. collecting main 325 ft. long, from whence the commingled wat- er will be conveyed through a concrete con-crete water tunnel a distance of 2105 ft. to a power house where it will be pumped through a pipe distribution system and used for industrial and miscellaneous purposes pur-poses in connection with the manufacture man-ufacture of steel at the Geneva Steel Plant located within Sees. 5, 6, 7, 8 and 17, T6S, R2E. Any unconsumed water will be returned re-turned to Utah Lake at a point S. 69 deg. 41' W. 2665 ft. from WVl Cor. Sec. 5, T6S, R2E. Protests resisting the granting of any of the foregoing applications, applica-tions, with reasons therefor, must be in affidavit form, with extra copy and filed with the State En-, gineer, 403 State Capitol, Salt Lake City 1, Utah, with a fee of $1 on or before October 21, 1944. Ed. H. Watson, State Engineer. Pub. Aug. 24, 1944, Aug. 31, 1944, Sept. 7, 14, 21, 1944. NOTICE TO WATER USERS The following, applications have been filed with the State Engineer by the Defense Plant Corporation, 504 Dooly Building, Salt Lake City, Utah, to change water in Utah County, State of Utah, all locations being from SLB&M. a-1722 It is proposed to change the point of diversion, place and nature of use of .223 sec. ft. of water from Apr. 1 to Oct. 31 from a 3-in. well located at a point N. 1740 ft. and E. 1125 ft. from SW Cor. Sec. 8, T6S, R2E. The water right was acquired by Underground-water Claim No. 2876 and was used to irrigate 15 acres of land embraced within NW4SW Sec. 8, T6S, R2E. Hereafter, an equal withdrawal of water, or .134 sec. ft. from Jan. 1 to Dec. 31, will be diverted from a 4-in. well, 145 ft. deep, located at a point N. 1783 ft. and W. 894 ft. from Shi Cor. Sec. 8, T6S, R2E, and designated as Well No. 6. The water so diverted will be commingled with water diverted under Applications Nos. a-1723, a-1724, a-1725 and a-1726 in a 10-in. collecting main 325 ft. long, from whence the commingled water wat-er will be conveyed through a concrete water tunnel a distance of 2105 ft. to a power house where it will be pumped through a pipe distribution system and used for industrial and miscellaneous purposes pur-poses in connection with the manufacture man-ufacture of steel at the Geneva Steel Plant located within Sees. 5, 6, 7, 8 and 17, T6S, R2E. Any unconsumed un-consumed water will be returned to Utah Lake at a point S. 69 deg. 41' W 2665 ft. from W Cor. Sec. 5, T6S, R2E. a-1723 It is proposed to change the point of diversion, place and nature of use of .223 sec. ft. of water from Apr. 1 to Oct. 31, from a 5-in. well located at a point N. 100 ft. and E. 1175 ft. from SW Cor. Sec. 8, T6S, R2E. The water right was acquired by Underground-water Claim No. 2877, and was used to irrigate 60 acres of land embraced within SWSWi4 Sec. 8, T6S, R2E. Hereafter, an equal withdrawal of water, or .134 sec. ft. from Jan. 1 to Dec. 31, will be diverted from a 4-in. well, 145 ft. deep, located at a point N. 1783 ft. and W. 894 ft. from Shi Cor. Sec. 8, T6S, R2E, and designated as Well No. 6. The water so diverted will be commingled with water diverted divert-ed under Applications Nos. a-1722, a-1724, a-1725 and a-1726 in a 10-in. 10-in. collecting main 325 ft. long, from whence the commingled water wat-er will be conveyed through a concrete con-crete tunnel a distance of 2105 ft. to a power house where it will be pumped through a pipe distribution distribu-tion system and used for industrial indus-trial and miscellaneous purposes in connection with the manufacture manufac-ture of steel at the Geneva Steel Plant located within Sees. 5, 6, 7, 8 and 17, T6S, R2E. Any unconsumed uncon-sumed water will be returned to Utah Lake at a point S. 69 deg. 41'W 2665 ft. from Whl Cor. Sec. 5, T6S, R2E. a-1724 It is proposed to change the point of diversion, place and nature of use of .056 sec. ft. of water from Apr. 1 to Oct. 31 from a 2-in. well located at a point S. 310 ft. and E. 1208 -ft. from W Cor. Sec. 8, T6S, R2E. The water right was acquired by Underground-water Claim N. 2878, and was used to irrigate hi acre of land embraced within NW-SW NW-SW hi Sec. 8, T6S, R2E. Hereafter, an equal withdrawal of water, or .033 sec. ft. from Jan. 1 to Dec. 31, will be diverted from a 4-in. well, 145 ft. deep, located lo-cated at a point N. 1783 ft. and W. 894 ft. from Shi Cor. Sec. 8, T6S, R2E, and designated as Well No. 6. The water so diverted will be commingled with water diverted divert-ed under Applications Nos. a-1722, a-1723, a-1725 and a-1726 in a 10-in. 10-in. collecting main 325 ft. long, from whence the commingled water wat-er will be conveyed through a concrete con-crete water tunnel a distance of 2105 ft. to a power house where it : will be pumped through a pipe dis- |