OCR Text |
Show EIGHTH STATION IT BLUE BELL READY iTintic Company AYill Explore irgin Ground From Two New els. During thij rast week- 'the manage - n:ent or the Eagle and Pine Bell company com-pany completed the station a'L the 800-foot 800-foot level. As ihe shaft work was progressing pro-gressing some time uko. the station at the 700 levpl was cut. so the company now has the advantage of these two now levels for prospecting above the ore body whose discovery on the 1000-foot level occasioned a complete reorganization reorganiza-tion of the mine arrangements. The ICagle and Blue Bell drifts, in following ore and ore Indications for several years nasi, gradually grew away from the main shaft, and When the new 1000 lce ore was opened, and when It had been opened to such a generous extent, the distance to ihe shaft was so great thai the cost of production was entirely loo high. The new shall was lh u started, and connections mad" with iins noa ore. The management win be two or three weeks vet timbering this new shaft, at which time the new holea-Ins holea-Ins equipment will begin Its heavy task of raising this ore for Ihe market". The shaft penetrated virgin ground, and t 7do and 800 levels win be driven as soon as possible to explore the same, |