Show AT CACTUS TUNNEL VV Work on the Long Avenue to Be Advanced Ad-vanced Twenty Feet Daily With two headings from which to dispatch work on the Cactus tunnel I out of Frisco It will now advance at the rate of twenty feet a day or 600 feet per month said the manajreme yesterday At this rate the avenue which extends into the zone f or 5800 feet and of which over 1000 feet has been driven will he completed long before be-fore the limit asked for by 1 the management man-agement and certainly will be ready for the transmission of ores as soon as the signal comes from the manage agemcnt of the biff mill and smejter In the meantime the plans for the mill and smelter are being worked on dally and will be ready for the approval of Mr Newhouse on his return from London Lon-don I |