OCR Text |
Show Lack of Money Stalls Project Lengthening of two bridges and a culinary water flume over the Surplus Canal will be delayed de-layed by Salt Lake City because of lack of funds. This was announced an-nounced this week in discussions ' between City Commissioners and Salt Lake City officials concerning con-cerning the proposed program of the U. S. Army Corps of Engineers Engi-neers to widen the Surplus Canal in the interest of flood control. Mayor Adiel F. Stewart said the city was interested in the flood control program planned by the Corps of Engineers in February but that the task of financing the bridge projects would have to be worked out. Bridges at Indiana Ave. and at 5th South will have to be j lengthened to conform with the j canal widening project. In addition, ad-dition, the Brighton Canal flume east of Redwood Road near California Cali-fornia Ave. would need length-'ening. length-'ening. I |