Show development and results in the development of the property we have found five different veins so far three of them have shown more or less ore for fourteen months prior to july 1 1905 our time and energies were devoted to the run ning of a long line of crosscut work in a general south southeast direction this new line of work is over feet in length since july L 1 1905 we have directed our work to the development of two of the most r promising veins the ore so far found in 1 these veins is very high grade running all the way from 50 ounces to ounces silver twenty to fifty per cent lead and to to 15 per ton gold some of this ground will be scoped later on these veins are showing great strength as they are explored and I 1 have no doubt that valuable ore bodies will be found as the work progresses the object of the management now is to place the mine on a paying basis as soon as possible as soon as that object is attained work will be pushed on other promising veins |