Show ARIZONA mine foreman W A buchanan of th the 3 mckinley mining company states that the objective of the crosscut on the level of the companas comp anys property near prescott has been reached A great flow of water has prevented exploration of the vein opened but bannings pann ings prove good gold values the hercules arizona mining alining company has three shifts at work on its recently acquired acquire I property at chloride the foot shaft has been and is to be sent down another feet and perhaps to the foot point the work is under the direction of G C johnson formerly of park city utah the gold ore mining alining company op operating erat at goodroad Gold road under the mana management glement of A C werden will its shaft to the present depth of feet and then send it feet deeper A drift will be run to the east on the new level to prove up the ore opened above where the values are around 20 a ton superintendent J A I 1 marr of the reorganized carmelita mines company states that active work is now under way at the companas comp anys old yuma mine located out from salome the ground is opened by about 1000 feet of workings and ore assaying as high as a ton has been found the average value is 1750 and a mill is contemplated tem plated to handle the ore an important surface discovery lias has been made on the property of the billy mack parker a at t 1 a I mining near point about 1000 feet south of the main shaft the vein is said to be ten feet between walls a large part carrying values up to 6 ounces in gold with a good percentage of copper the ore is being sacked cached the mine is under the management of col COI J H dowe |