OCR Text |
Show OUDEN S.MELTINU WORKS. The Register Smelting and Refining Co. havo built one blast furnace and contemplate building a revcrbatory furnace and a refining furnace, having nearly .ull the material on hand. These works made a preliminary prelim-inary run on Monday to test their furnace. fur-nace. They commenced charging at 4: :i0 p.m. and at 10 p.m. had run out fifteen bars of base bullion. Five assays as-says made from the bullion, Irom samples sam-ples taken at various times, averaged over IS1.) ounces of silver per ton, or JD.ol per ton in silver. The lowest sample run and the highest $2jJ. These furnaces are smelting ores exclusively ex-clusively from Pinyon mine, Parley's Park, Uintah mining distriel, having contracted for :iOO tons per month from that mine, as they find the ores arc of a line smelting quality, without mixture of other ores and requiring but little flux. |