Show I I SINKING WITH THREE SHIFTS Tesora Commenced to Go to the Deep Yesterday Manager John T Hodson inaugurated sinking again yesterday morning in the shaft at the Tesora and with three shifts will get down to the 300 level as fast as possible In the meantime a sufficient number of men will be kept I at work extracting ore to meet the expense I ex-pense of operating the mine When I the 300 level is reached the vein will I again be opened and if Manager Hod I son has his nay the shaft will still go deeper as he is very anxious to get down and make a mine in fact of the i Tesora A No6 blower and 500 feet of eight 1 inch pipe was yesterday shipped to the miner and when the machine is in place the work of drifting on the ore will be greatly facilitated as the air is npw none too good i j Another car of ore was on the market yesterday and Mr Hodson says a nice secondclass dump is beginning to accumulate i i ac-cumulate a a result of the extraction of shipping ore though no more sec shipping I ondclass Is being broken than is absolutely ab-solutely necessary The vein at the point from which shipments are now being made is all of sixteen feet wide I and stands so nearly perpendicular that Manager Hodson does not know which which of the the foot Avails is the hanging and II |