Show SHAWMUT SH OPERATIONS Everything Being Shaped Up Tip to Start Mill l Next Nex Month Superintendent R t G Legg LegS of the Shawmut came in from Bingham yes es The new tunnel is now in in over 1000 feet and connections with the vein ein will wi be made he is 18 quite sure ure by the middle of next mouth month Iri It Ii the mean meantime meantime time drifts drits levels and crosscuts are being pushed along in the upper Tipper work workings workings ork ings and large amounts of ore are are be being being belag ing lag out The big mill mi wi will be started just as soon as connections are made in the lower loer tunnel |