Show NAY Y BE E LONG STRIKE STR I Anaconda Company Having Havig Trouble With Its It Men I IB Butte B tte Mont April 13 A special to I the Miner from Anaconda says Six weeks week ago sixty members of the Ma Machinists Machinists union employed by the Ana Anaconda Anaconda conda condo Copper Mining company at this place went on strike for a day at 45 cents an hour Today there I are men affected by the trouble trou le with Wih indications pointing to a prolonged struggle The union has un under under Under der similar grievances joined the te I strikers and as a a result resul the tE foundry i department of the Anaconda company has been shut down j Since the strikers interview with wih I I President of the Anaconda min mm ing properties in which they were told that no concessions would be offered the union men have assumed a more aggressive attitude and as a conse consequence consequence quence the machinists machinist employed at the Washoe Vasho e new works struck this morn ing lag The machinists employed em loyed by the Butte Anaconda Pacific railway riwa have hae I Imade made similar demands and submitted an a ultimatum to Master ater Mechanic Har Bar Harrity Harrity rity rIy demanding de a ig an a answer a within five hours hour Three Thre or four Butte S tte mines have closed close down do as a a result of the trouble I |