Show The Ontario The following points in relation to the Goliath among Utah mines we copy from the Record The shaft at the No3 Lnario works has reached a depth of 855 feet and the work of cutting the stations is to be commenced at once There are to be three at that level a pump boo tank and working station sta-tion Burley drills are to be used to hurry forward the work These stations are deeper by about twenty feet than the 800 in Ho 2 and when completed a tunnel will be run to carry the water from No 2 to the tank station of No3 from which place it will be thrown to the 600 tunnel by the Cornish pumping engine en-gine Ore is being mined at the GOO station sta-tion of No 3 and shipped to the millAt At No 2 preparations are now being carried forward to cut the vein at the 900 level which will be 100 feet deeper than the lowest workings work-ings in the mine at the present I time It is calculated that the crosscut from this station will cut the vein in about sixty feet |