OCR Text |
Show Monster Montana Dam Completed. Helena, Mont. At noon Wednesday Wednes-day the six big gates of the llausor lake dam, aerosH the Missouri river eighteen miles from Helena, were Iropped from their cables, closing up the dam, thus making tbe practical ronipletlon of tbe greatest engineer-lug engineer-lug enterprise In Montana. The dam has been constructed by the United Missouri ltlver Power company at a .ost of I2.fi00.000, to replace the one sashed out three years ago. It Is aver COO feet In length, 130 feet In 1 height and at Its base Is 100 feet 1 ihlck, all of solid concrete. |