Show LEHI TINTIC ITC SOON SOU MAY BEGIN ORE OE SHIPMENTS It is reported but not confirmed officially that the Lehi Tintic will not wait for the completion of Its new shaft now under way to begin the shipment o of ore from the body re recently recently recently re- re located at a junction of the two tunnels and This will necessitate the construction construction construe construe- tion of a roadway the building of ot a along along along long chute or the installation of a tramway In any event it Is stated that the proposed shipments will not In any manner interfere with the sinking of ot the new shaft which will give the mine several hundred feet of additional depth and enable the cutting of three big fissures exposed while the new tunnel recently completed completed com corn was in s S of being driven Quite a number of ot well known Tintic mining men have become in interested interested interested in- in in the Lehi L Tintic These men have examined the property and andare andare andare are so pleased with the general outlook outlook out out- look that they are buying b the th stock and advising others tp to do likewise In their opinion it is almost sure to become a big producer |