Show THE B W H richfield reaper from james H wells who was in richfield saturday attending a meeting at the democratic central committee the reaper learns that the work of developing the B W H mine continues and that the results are not disappointing mr wells is still driving down on the vein in tunnel no 2 the vein is dipping into the mountain and holds its own in size and values the company has reached a depth of feet in the shaft being sunk in tunnel no 3 and crosscutting towards the east has begun it is the expectation to strike the other wall of the ledge matter which has been followed and it is not improbable that a view which runs through the first shot claim will be struck the indications now are that the company will have to go down to reach the contact and then the real value of the property will be demonstrated d mr wells will have another carload of ore ready for a shipment this week but he cannot get a car for loading because the railroad company is using the siding to run to marysvale Marys vale while the track which was recently covered with mud and debris is being cleared off |