Show brid bride bridgie 0 e at gr Green e river N now ow open to light traffic the highway bridge at green river was sufficiently repaired to permit safe passage for vehicles of up to eight tons gross weight sc Pc cording to several newspapers of recent date although a complete army bridge was ordered when it seemed that the broken span could not be repaired it was later found feasible to drive steel piling instead of the wooden piling tried at first and the pontoon bridge is being kept for future emergencies |