Show NOTICE TO WATER USERS the following applications have been filed with the state engineer to appropriate water in san juan county nty state of utah throughout the entire year unless otherwise designated all locations being from utah state road com mission state capitol Qa pitol salt lake city 01 see sec ft from a 6 in well ft deep at a point N 2144 ft and E 2381 ft from SW cor see sec 1 and used from april I 1 to nov I 1 to irrigate acres of land embraced within sec 1 i and for year round domestic purposes imposes from the well the diverting fiig and carrying works will consist of lin l 1 in iron pipe a concrete reservoir and small ditches 75 7 charles redd la sal ut ac ft from coyote creek tributary to west coyote creek to hatch flatch canyon creek at a point N f ft t and E ft f from rom E cor see sec 12 to be stored from january 1 to december 31 in a reservoir by constructing a dam to a height of 60 50 ft at the so called rattlesnake reservoir site at the above described point the reservoir will inundate aso acres of land embraced within SW see sc 7 NW see sec 18 and eva E see sec 12 and nea sec 13 the water after having been impounded i in the reservoir will be released from mar alar 1 to dee dec 31 and allowed to flow down the natural channel of west coyote creek to a point N ft from SW see sac 2 where it will be re diverted into a ditch and used to irrigate acres of land embraced within sees 5 6 7 8 9 and 10 tass and sees 1 2 and 12 the water will also be used during the entire year for incidental bering and domestic use charles radd asal lasal L la sal ut 10 sec ft from mar 1 to nov 30 from west coyote creek tributary to san juan river at a point N ft from SW cor sec 2 to be conveyed in a ditch a distance of ft and used to irrigate acres of cf land embraced within sec 10 charles redd la sal ut 30 see sec ft from la sal creek at a point N ft from SE cor sec 7 the water will be diverted from la sal creek and conveyed through the la sal live stock company ditch for a distance of ft to a point where coyote creek meets said point from this pont the water will flow into said creek and west coyote creek a distance of ft to rattlesnake reservoir where it will be stored in a reservoir to be created by constructing a dam to tb a height of 50 ft the location of the center of which is N ft and E ft from ea cor see sec 12 the reservoir at full water stage will inu anun n date acres of land within NW sec 18 SW 4 1 sec 7 E eya see sec 12 and NE see sec 13 the total storage capacity of the reservoir will be acre feet the water will be released from the reservoir from mar afar I 1 to dec I 1 and allowed to flow down the natural channel of west coyote creek to a point N ft from SW cor see sec 2 where it will be re i diverted into a canal and used to irrigate acres of land embraced within sees 56 56 7 8 9 and 10 and sees 1 2 and 12 charles redd la sal ut 30 sec ft from beaver creek tributary to la sal creek to colorado river at a point N ft from SW cor car sac 9 the water will be conveyed through the la sal irrigation com banys canal to a point where the canal meets coyote creek thena down coyote creek to the rattle snake reservoir where it will be stored in a reservoir to be constructed I 1 ted by building a dam to a height of 50 60 ft the center of which is located at a point N ft and E ft from EV E cor see sec 12 at full water stage the reservoir will inundate acres of land embraced within see sec 18 SWI SW sec 7 ma see sec 12 NE sec 13 the total storage capacity of the reservoir will be ac a c ft the water will bere be released from they ther reservoir from mar I 1 to dec I 1 and will flow down the natural channel of the west coyote creek to a point N ft from SW cor sec 2 where it will be re diverted into a canal and used to irrigate acres of land embraced within sees 5 6 7 8 9 and 10 and sees 1 2 and 12 protests pretests resisting the granting of any of the foregoing applications with reasons must i be in affidavit form with extra copy and filed with the state engineer state capitol salt lake city 1 utah with a fee of 1 on or before november 25 1944 ED H WATSON state engineer 1st ast pub sept 28 last oct 26 1944 |