Show H ENGIN el H OF FOREST SE H V ICE IN FISH 1911 1 AREA accompanies supervisor on inspection trip to flood control dams 1 J P martin regional engineer from the ogden office of the forest service visited the fish lake forest saturday and in company with supervisor C A mattsson superintendent parkinson and camp engineer nicholls made an inspection of the flood control dams in soldier canyon and salina canyon some of these dams damaged by floods which occurred during july and august and the purpose of the inspection was to determine the and of repair work that should be done on these projects the bull pasture dam at the head of salma salina canyon will be completed this week this is one of the largest flood control projects that has been constructed d on the fish lake forest and will be the means of reducing future flood damage on the salina creek watershed this creek has its source in gunnison valley on the manti forest mr matrin left sunday morning on an inspection trip of flood control projects and road projects in nevada since the program was s started nine flood control dams have been constructed on the fish lake forest these dams are as follows upper dam meadow gulch drainage area 5 square miles spillway 19 ft by 5 ft lower dam meadow gulch drainage area 10 square miles spillway 17 ft by 5 ft kenner dam drainage square miles spillway 30 ft by ai 7 2 ft bull pasture dam drainage area 61 square miles spillway aj 62 ft by 60 ft salina dam drainage area square miles spillway 80 ft by 61 ft soldier canyon kitchen dam drainage area IS 18 square miles spillway 40 ft by 5 ft fillmore Fill dam drainage district 60 square miles spillway 60 ft by 6 ft |